Coefficient and Discount

In the lower right part of the selected estimate sheet, under the list of positions occupied in the project, there is a column where the cost increase coefficient and discount are indicated. Here, these two parameters can be set at once for the entire given sheet. Their values are set separately for equipment (the "Rent" field), separately for consumables, and separately for services. The discount amount is indicated as a percentage, and the coefficient value is indicated in times.

1

The "Coefficient" and "Discount" parameters can also be changed simultaneously for all sheets of this estimate. To do this, click on the "%" symbol, which is located on the right side of the line with the names of the estimate sheets.

1